
What’s happening today?
CD9’s Mazariegos v. Ugarte race is still up in the air: Another election results drop is happening today at around 4 p.m. A race that’s still being watched is the one for the Los Angeles City Council’s 9th District seat, which covers South Los Angeles, USC and parts of downtown Los Angeles. Jose Ugarte, a recent former top aide to the current of the council member for the 9th district, Curren Price, has held off tenant organizer Estuardo Mazariegos, even as the results have steadily narrowed the gap between the two. The higher turnout in the midterm election (and reports of long lines at the polls) had injected some hope for supporters of the DSA-LA backed Mazariegos, but there is now very little runway left. LA county election officials estimate they have 53,000 ballots left to count — and ballots for the CD9 race are usually only just over 1% of that. Mazariegos would have to get more than an overwhelming majority (over 77%) of the remaining votes that are estimated to be left (an inexact estimate to be sure) — and Mazariegos share of the results so far has been well under that.
Election turnout is overpeforming: As of Sunday’s results drop, election officials were reporting a turnout of at least 52.80%, so this election is overperforming compared to the last midterm general election in 2022, which ended up with a 43.65% turnout.
Mayor Karen Bass is laying low: While public schedules can certainly change, the mayor sent out a multi-day schedule from today, Nov. 9, Monday to Nov. 11, Wednesday, saying she won’t be appearing at any public events.
Exiting Blumenfield marks new ‘creek’ park, a publicly-owned ice rink, and the Madrid’s re-opening — but The Reseda’s revival is now dead
Bob Blumenfield is wrapping up his final and third term on the Los Angeles City Council by doing a tour of grand openings for projects that have been on his plate for some time. This morning, he’s doing an 8:30 a.m. ribbon-cutting of the Caballero Creek Wetlands Park, an asphalt lot-turned park — built at a confluence in Tarzana between the creek and the Los Angeles River — that features a walking path and native plants watered by a solar-powered irrigation system.
Last week, Blumenfield marked the opening of the Reseda Ice Rink, the first publicly-owned ice rink in the city of Los Angeles that was a decade in the making, with programming beginning on Friday. And later this month, Blumenfield is marking the grand re-opening of the Madrid, a 100-year-old former silent movie theater in Canoga Park that’s been under renovation and that will host live, performing arts events.
At least one long-time effort of Blumenfield’s won’t be coming into fruition before he leaves office— and that’s a movie theater project in which his office had been working to revive The Reseda. It had been seen as a way to revitalize a struggling Sherman Way commercial corridor. It was to have included a food hall and a movie theater (which had the involvement of the Laemmle at one point). Blumenfield shared the news around mid-October, writing that the developer the city had brought on won’t be able to finish the project.
“I was promised that the Theatre would be fully completed and open to the public by the end my term,” Blumenfield’s statement said. “It is deeply disappointing to me that despite our best efforts, public investment, and oversight, this did not happen.”
Blumenfield is expected to hand the baton off to Barri Worth Girvan, who declared victory last Friday in last Tuesday’s Nov. 3 runoff election, on Dec. 14. Girvan’s opponent, Tim Gaspar, publicly conceded on Saturday. Meanwhile, Blumenfield is not planning to be too much of a stranger. He has been prepping to run for the 27th district state senate seat in 2028, and that’s a seat now represented by Henry Stern that wraps through most of the San Fernando Valley.
What’s squawking: 💧Stormwater capture contract for Valley Village Park: Agenda / Video // ❤️🩹 LA city’s health commission need a shot of life: Agenda
💧An $11.5 million contract related to a stormwater capture project at Valley Village Park could go to American Integrated Services, Inc. The proposal is being reviewed by the Board of Public Works at their 10 a.m. meeting.
❤️🩹 The LA city health commission is trying to reinvigorate the health of their panel. They’re meeting at 6 p.m. today to discuss putting together a letter to council members asking to have the ability to change meeting days and times, decrease the number of commissioners, and have the ability to meet remotely.
What just happened?
ICE presence at Boyle Heights hospital raises alarms: ICE was spotted blocking the entrance of Adventist Health White Memorial in Boyle Heights, late Friday and early Saturday. Two people, U.S. citizens, were also detained during a protest. Elected officials, including Mayor-elect Nithya Raman, joined a march and protest Saturday afternoon to speak out on ICE’s presence. She and state Sen. Maria Elena Durazo, Assemblymember Mark Gonzalez, LA City Council member Ysabel and community members, including activists, took part in the march to deliver a letter to the CEO of the hospital. Jurado is calling on the hospital to “publicly disclose agreements with ICE and end any voluntary medical-services contract with the agency.”
LA city expected to overspend by more than $300 million, with big chunks in the fire department and due to liability and outside counsel costs: LA city officials say they are projecting that the city is on track to overspent by $321.80 by the end of this fiscal year (it’s counted from July 1, 2026 until June 30, 2027), of which $140.88 million is due to costs within the Fire Department. Next on the list for overspending was the City Attorney’s Office due to high liability and outside counsel costs. There is also overspending in the General Services Department (GSD), which manages the city’s properties, and the Sanitation Bureau. GSD had unbudgeted employee payouts, and Sanitation had to pay overtime because of staffing vacancies. And yes, compared to the same time last year, and the year before, the overspend projection is higher this year. Last year they had been projecting $79.75 million in overspending around the same time, and the year before that, they were projecting $195.85 million in overspending. You can catch the quarterly financial status reports here.
Curren Price got a glowing sendoff during Friday’s council meeting: Price’s colleagues voted to rename Slauson Connect Center after him, once ceremonially, and then finally in an official vote, after public comment. The unusual voting process happened as some people who came to the meeting spoke against the renaming motion during public comment. They pointed to the the District Attorney’s corruption case against Price. Those public commenters didn’t get to speak until after council members and others had spent almost two hours giving glowing tributes to Price, including for his fashion sense. Another running theme in the send-off remarks was Price’s role as mentor to the other council members, including Council President Marqueece Harris-Dawson.
Raman excused from Friday’s council meeting: Nithya Raman did not attend Friday’s meeting that was devoted mostly to celebrating Price. Raman had been excused from the meeting, which was the first council meeting held after Tuesday’s election in which Raman achieved an upset that denied Mayor Karen Bass re-election. All of her colleagues on the City Council had backed Bass. The two council meetings earlier in the week, which are customarily held as scheduled during other elections, had been cancelled.
Raman to step into mayor’s role amid in-progress city budgeting: Raman, who has a short 40-day timeline to get ready for the mayor’s office, can begin getting into the budgeting process, which is already underway. Mayor Karen Bass issued a budget policy letter on Oct. 5 instructing departments to turn in a short proposal for new and expanded programs on Oct. 16, and to turn in a full proposal by Nov. 19. City Administrative Officer Matt Szabo tells The LA Reporter that their office is prepared to assist Raman with developing her budget proposal, which if Measure LA passes, will be due April 1, nearly three weeks earlier than the April 20 deadline that’s now required. Here’s what Szabo wrote back about the budget process amid a mayoral transition:
“The term of the new Mayor will commence on December 14, 2026. While this is after departments will have submitted their draft budgets, the new mayor and her team will lead the budget process from that point forward, and make all decisions required to have a proposed budget released to the City Council by April 1, 2027 (the new charter deadline per Measure LA, should the current results hold). This Office will provide whatever assistance is needed to the Mayor-elect during the transition period (including providing access to the department draft budgets), and provide daily support to the new Mayor and her team throughout the budget development process once they assume office.”


